Roofing Tear-Off Checklist
Shingles are heavy and sharp — this checklist keeps the tear-off fast and your driveway intact.
Before Tear-Off Day
- Count your squares (1 square = 100 sq ft). Up to ~30 squares of single-layer shingles fits a 20 yard.
- Double-layer tear-off? Double the debris โ talk to us about a 30 yard or a mid-job swap: 386-249-3082.
- Schedule dumpster delivery the day before the crew arrives โ never the morning of.
- Ask for placement as close to the eave as safe access allows โ every foot of carry costs crew time.
- Lay plywood under the container's footprint if you're worried about driveway marks.
During the Tear-Off
- Tarp from the eave to the dumpster edge so shingles slide in, not onto the lawn.
- Load shingles evenly across the floor โ a nose-heavy container is a problem at pickup.
- Felt paper, flashing, and drip edge all go in with the shingles โ it's all C&D debris.
- Keep household junk OUT โ mixing MSW with roofing C&D can mean refused pickup.
Cleanup & Pickup
- Run a magnetic sweeper over the lawn and driveway twice โ roofing nails find tires for months.
- Load level with the rim; shingles are dense, so resist the urge to mound them.
- Call for pickup the same day the roof is dried-in โ done is done.
Related reading: Roofing dumpster rental in Live Oak → Dumpster weight limits in North Florida → 20 yard details →
Ready for the Dumpster?
Flat-rate 15, 20 & 30 yard dumpsters from $350 — 7-day rental, delivery, pickup & disposal included. No per-ton overage fees on normal loads.
Get a Quote Take the Size Quiz